ConstrCalc NEVER makes assumptions. You provide project data — we perform mathematically accurate calculations, insights, conversions & reports. Transparency Policy →
TERM

ADA Compliance

Americans with Disabilities Act — accessibility requirements for commercial buildings in the US. Comparable regulations exist in most countries (BS 8300 UK, DIN 18040 DE).

MATERIAL

Aggregate

Coarse granular material (gravel, crushed stone) used as filler in concrete. Measured in cubic feet (ft³) or cubic meters (m³).

TERM

Bid

A written proposal offering to perform construction work at a specified price. Also called tender in UK / Commonwealth.

DOCUMENT

BOQ

Bill of Quantities — an itemized list of materials, parts, and labor with quantities required for a project.

TERM

Contingency

A reserve percentage (typically 5–10%) added to a bid to absorb unforeseen costs. Not the same as profit or overhead.

METRIC

Cost Per ft²

Grand Total ÷ Total Area. A per-unit metric used to compare projects. ConstrCalc computes this deterministically from your values.

WORK

Excavation

Removal of earth to form a cavity for foundations, basements, or utilities.

WORK

Formwork

Temporary molds used to shape wet concrete until it cures. Also called shuttering.

ROLE

General Contractor (GC)

The primary contractor responsible for coordinating and delivering the entire project. Also called Main Contractor (UK).

METRIC

Grand Total

Subtotal + Overhead + Profit (+ Taxes when applicable). The final project figure computed by ConstrCalc from your inputs.

TERM

Hazmat

Hazardous Materials — inspection and handling required in renovation or industrial construction. Adds legal/permit line items.

STRUCTURE

Load-Bearing Wall

A structural wall that carries weight from above. Cannot be removed without engineering approval.

TERM

MEP

Mechanical, Electrical, Plumbing — the three primary sub-systems in commercial/industrial buildings.

FINANCIAL

Overhead

Cost of running the business (rent, insurance, admin) allocated to a project. Formula in ConstrCalc: Subtotal × Overhead%.

DOCUMENT

Permit

Government authorization required before construction begins. Categories vary by project type (residential, commercial, industrial, renovation).

FINANCIAL

Profit

Margin retained by the contractor above cost and overhead. Formula in ConstrCalc: (Subtotal + Overhead) × Profit%.

TERM

Punchlist

Final list of small items to complete or fix before project sign-off. Called snag list in UK.

MATERIAL

RCC

Reinforced Cement Concrete — concrete with embedded steel reinforcement (rebar). Common in Asian residential construction.

MATERIAL

Rebar

Reinforcing bar (steel) embedded in concrete to add tensile strength.

FINANCIAL

Retention

Portion of contract value (typically 5–10%) held back until project sign-off. Common in commercial contracts.

DOCUMENT

RFP

Request for Proposal — solicitation from a buyer inviting contractors to bid on a scope of work.

WORK

Site Survey

Land survey — mapping the site's boundaries, topography, and existing structures before design.

LABOR

Skilled Labor

Trades requiring specific training — electricians, plumbers, HVAC technicians, finish carpenters.

METRIC

Subtotal

Materials + Labor + Equipment + Legal costs, before overhead and profit.

WORK

Takeoff

The process of quantifying materials from architectural plans. Typically produced by an estimator before bidding.

TERM

Tender

British/Commonwealth term for Bid — a formal offer to perform work at a stated price.

TERM

Turnkey

A project delivered ready for immediate use. Contractor handles design, build, and finish.

TERM

Zoning

Municipal regulations governing what can be built on a parcel of land.

Advertisement · AdSense placeholder